Thomas Hassall Logo

From the College Manager

You are here

The new Physical Education Centre is entering an exciting phase of construction with lots of tradesmen working inside and outside the building.

On the front of the PEC complex, the steel support structure for the front decorative panels are being lifted into position while at the back facing the sports field, feature panelling is also being installed. On the inside many teams are working in the Sports Hall installing huge ceiling fans, speaker systems and acoustic linings in preparation for the timber sports flooring system being laid in a few weeks. In the change-rooms and toilets, painters and tilers are working hard before all the fixtures are installed. There is still lots to be done but thanks to the great team from Mark Moribito Constructtions, we are confident it will be completed sometime during Term 2.

Warren Murray
College Manager